Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Asharq Al-Awsat
Asharq Al-Awsat
Business
Asharq Al-Awsat

ADNOC Invests $318 Million to Connect Smart Wells at BU Hasa Oilfield

The Bu Hasa asset is located 200 kilometers south of Abu Dhabi city. It is one of ADNOC’s oldest oil fields that have been producing since 1965. - WAM

The Abu Dhabi National Oil Company (ADNOC) announced Tuesday the details of an investment worth to $318 million (AED1.16 billion) to connect newly drilled smart wells to the main production facilities at Bu Hasa, which will sustain production capacity of 650,000 barrels per day (bpd) at ADNOC’s largest onshore asset.

The engineering, procurement and construction (EPC) contract has been awarded in two packages by ADNOC’s subsidiary, ADNOC Onshore, state news agency WAM reported.

The first package is valued at up to $158.6 million (AED582 million) and has been awarded to China Petroleum Pipeline Engineering Co. Ltd, while the second, with a value of up to $159.1 million (AED 583.9 million) - has been awarded to Robt Stone (ME) LLC.

The contracts's duration is up to three years, with the option of a two-year extension.

In this regard, Yaser Saeed Almazrouei, ADNOC Upstream Executive Director, said: "This EPC award demonstrates how ADNOC is leveraging advanced technologies, such as smart wells with state-of-the-art remote capabilities, to drive higher performance from our assets and resources, and to generate additional value."

"The award underpins our strategic objectives to expand production capacity and create a more profitable upstream business with over half of the contract value flowing back into the UAE’s economy, supporting local businesses and stimulating economic growth."

According to WAM, the EPC contract will see up to 260 conventional and non-conventional smart wells installed, which enable remote operations. The installed tie-ins will be different from traditional tie-ins previously used by ADNOC Onshore, as the contractors will procure all required equipment on an upfront basis allowing for faster construction and well hand-over.

In 2018, ADNOC awarded a contract for the Bu Hasa Integrated Field Development Project (BUIFDP) to increase the production capacity of the asset to 650,000 bpd and sustain long-term production as part of its strategy to expand its crude oil production capacity to 5 million bpd by 2030. This new award builds on the substantial progress made to date and will enable ADNOC Onshore to unlock greater value from the asset.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.