Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Special Correspondent

Steps to shift VSSC’s massive cargo from Kollam to Thumba

Arrangements are being made for the smooth transportation of a massive settling chamber for the trisonic wind tunnel being constructed at the Vikram Sarabhai Space Centre (VSSC) at Thumba here from the Kollam port.

The settling chamber for the wind tunnel was brought in two sections of 128 tonnes and 57 tonnes to Kollam from Mumbai. They will be moved to Thumba over seven days by road — at the rate of 10 km a day — on a hydraulic-axle trailer.

Coordinated efforts

The Kerala State Electricity Board and the Departments of Forests, Police and Public Works have been directed to ensure the smooth transportation as low-hanging overhead cables and tree branches could hinder the trailer’s progress.

The 128-tonne section is 9.8-m long, 5.6-m broad and 5.7-m high. The 57-tonne section is 5.1-m broad, 5.9- m long and 6.05-m high. When loaded on the trailer, the height of the cargo will be over 7 m.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.