The architect’s model of how the finished airport will look from abovePhotograph: PRAugust 23 2007: Two workers mop the floor of the hall of the newly-constructed terminal threePhotograph: Victor Liu/EPASeptember 8 2007: Construction workers line up before a ceremony to mark the raising of the roof of the airport's new maintenance hangarPhotograph: Greg Baker/AP
September 8 2007: A worker in the new maintenance and repair hangar, large enough to accommodate four Airbus A380s or six Boeing 767sPhotograph: Greg Baker/APSeptember 12 2007: Entering the new terminal buildingPhotograph: Wong Maye-e/APSeptember 12 2007: A woman wearing a safety helmet looks round the new terminal buildingPhotograph: Wong Maye-e/APFuturistic glass walls, metal clad roofs and a vast 4.8km-long passenger concourse are included in the designPhotograph: Wong Maye-e/APA model of one of the passenger terminalsPhotograph: PR
Sign up to read this article
Read news from 100’s of titles, curated specifically for you.