Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Staff Reporter

Reconstructed bridge opened

The reconstructed Pallikuttumma bridge in Kuttanad was partially thrown open for traffic on Saturday.

The bridge was reconstructed as part of reconstructing the Alappuzha-Changanassery (AC) road.

Meanwhile, the construction of a flyover at Mankombu and the road reconstruction work are making progress.

As part of the project, 2.9 km of the road will be refurbished using the bituminous macadam bituminous concrete method. Another 8.27 km will be strengthened by laying geotextiles and a 9-km stretch will be rebuilt with geogrid and geotextiles-encased stone column. The plan is to reconstruct at least 10-km of the road before the monsoon season.

Apart from reconstructing the road and bridges, seven flyovers at places prone to severe flooding are planned. The project, which is expected to prevent flooding of the road during the monsoon season, will be completed in 2023.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.