Nine years of construction work, at a cost of more than $5 billion, have equipped the Panama Canal with a third set of locks and deeper navigation channels, improvements that will double its capacity. When the new locks slide open for the first time in late June, the reverberations will be felt at Asian gas terminals, on Great Plains farms, and in ports from Long Beach, Calif., to Santiago, Chile.
To contact the authors of this story: Alex Nussbaum in New York at anussbaum1@bloomberg.net, Naureen Malik in New York at nmalik28@bloomberg.net, Christopher Cannon in New York at ccannon17@bloomberg.net.
To contact the editor responsible for this story: Cristina Lindblad at mlindblad1@bloomberg.net.
©2016 Bloomberg L.P.