Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Evening Standard
Evening Standard
National
Jason Collie

London Bridge closes to most traffic for seven months in £5m improvement scheme

London Bridge has been closed to most vehicles for the next seven months due to a £5 million roadworks project.

Only buses, taxis, motorcycles and bicycles will be able to use the bridge until October.

Private hire, freight vehicles and general traffic will be diverted.

The bridge will be open to pedestrians but they have been warned pavement space will be reduced until Agust 7.

Pedestrians will also be able to use the bridge, but Transport for London said there would be less space than usual.

The work will include having 24 of the bridge’s bearings replaced, with the entire surface re-waterproofed and replaced.

Drivers are being warned diversions across Tower Bridge and Blackfriars Bridge will be “extremely busy”.

The current form of London Bridge replaced a Victorian stone arch which was sold to American entrepreneur Robert P McCulloch and reassembled in Arizona.

PA Media contributed to this article

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.