Labor says it has been given leaked documents which show the design to turn Adelaide's South Road into a non-stop motorway and also reveal the project's end date will be delayed by more than a decade.
Opposition transport spokesman Tom Koutsantonis said the document prepared by the Department for Infrastructure and Transport also identified a tunnel as the preferred option for the section of the road from Tonsley to near Anzac Highway.
It would take four and a half years to complete, and the second stage — between Anzac Highway and the River Torrens — would not begin until after that work was finished.
"What we know now is the Government was planning to announce in the budget a tunnel from the Gallipoli Underpass towards Tonsley," Mr Koutsantonis said.
"It also shows South Road now won't be completed until 2035.
"South Australians are going to have to wait five federal elections and four Olympic Games until this road is completed."
In 2013, then prime minister Tony Abbott pledged to upgrade South Road within a decade.
The State Government wants to turn the route into a 78-kilometre non-stop motorway from Old Noarlunga to Gawler.
Mr Koutsantonis said the "extraordinary leak" showed an open motorway would be the cheapest option, have the highest cost-benefit ratio and would be the cheapest to maintain.
Heritage and acquisition difficulties
The last part of the project, through inner-western suburbs such as Edwardstown and Mile End, is among the trickiest because of the heritage and commercial buildings that straddle the road, including the Thebarton Theatre.
The report said it would be $800 million cheaper to not build exits at Sir Donald Bradman Drive for airport access, a move which would also save up to 100 properties from acquisition.
A further $300 million could be saved by building the motorway over the River Torrens instead of a tunnel under it.
If the State Government proceeds with this plan, the project is expected to cost $8.9 billion.
Only $5.5 billion has been budgeted for it at this stage.
The RAA first suggested tunnels for the project in 2009 under the former Labor government, but enquiries into the possibility only started under the Liberals in 2018.
'Fake news', says Premier
Premier Steven Marshall said any suggestion Adelaide's north-south road corridor project would take until 2035 to complete was "fake news".
Mr Marshall said the leaked papers looked to him like an old document.
He said he would reveal more details about the project and its expected duration in coming weeks, but he insisted a 2035 completion date was wrong.
"That's definitely not correct; that is absolute fake news," he said.
"As the Treasurer said two or three weeks ago that we would be completing this project in 10 years — it's a very important project.
"The only chance that it'll take until 2035 is if somehow Tom Koutsantonis gets back into government."
"There are real complexities to this project. Part of it is making sure we get the balance right in terms of the cost, in terms of the timeframe, also in terms of the inconvenience of the build and also the property acquisition."
Treasurer Rob Lucas is due to hand down the State Budget on November 10.