Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Staff Reporter

Komalam bridge gets administrative sanction

Ending a long wait, the State government has accorded the administrative sanction for reconstructing the flood-ravaged Komalam bridge near Puramattom.

According to Mathew T. Thomas, MLA, administrative sanction of ₹10.18 crore has been granted for reconstructing the bridge across the Manimalayar, which was damaged by strong currents in October last year. The plan envisages demolishing the remains of the old bridge and building a new bridge in its place.

The high-level bridge will have a total width of 11 m, including a 7.5-m carriageway and 1.5-m-wide pavement on both sides. The structure will be constructed with three spans of 28 m on the river and two land spans of 12.5 m each on both sides.

An estimate has been prepared after preliminary analysis, including soil testing. Since the project cost exceeds ₹5 crore, a special permission too has been accorded.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.