Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Reuters
Reuters
Business

Tepco finds melting of ice wall at Japan's Fukushima Daiichi plant

FILE PHOTO: An employee of Tokyo Electric Power Co. (TEPCO) looks up at a tank reserved for storing treated water at the tsunami-crippled Fukushima Daiichi nuclear power plant in Okuma town, Fukushima prefecture, Japan March 1, 2021. REUTERS/Sakura Murakami

Tokyo Electric Power Co (Tepco) will launch remedial works at the stricken Fukushima Daiichi nuclear plant to strengthen an ice wall intended to halt the flow of groundwater after testing indicated partial melting.

The work could begin as early as the start of December, according to a presentation from the plant operator dated Thursday, part of a costly and troubled effort to secure the site following the 2011 earthquake and tsunami.

The ice wall is intended to limit the seepage of groundwater into the plant, which has created large amounts of toxic water being stored by Tepco in tanks.

Japan plans to release more than 1 million tonnes of water into the sea after treating it. The water contains the radioactive isotope tritium, which cannot be removed.

(Reporting by Sakura Murakami and Sam Nussey; Editing by Muralikumar Anantharaman and Stephen Coates)

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.