Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
A Correspondent

Gap Road: traffic to be resumed today

Traffic on the Gap Road stretch of the Kochi-Dhanushkodi National Highway will be temporally resumed on Wednesday morning. The decision was taken after an expert team from the National Institute of Technology, Calicut, (NIT-C) on Tuesday inspected the landslip area on the Gap Road stretch where a spring was detected while removing the debris recently.

Single-lane traffic

“Single lane traffic will be allowed from Wednesday to January 2. The road will then be closed for widening works and traffic will be resumed again on January 14,” said Rex Felix, Assistant Executive Engineer, NHAI, at Devikulam.

He said that only single lane and light motor vehicle traffic would be allowed on the route. The NIT-C team led by Chandradharan and district geologist Ajayakumar, Devikulam subcollector S Premkrishnan, S. Rajendran, MLA, and national highway officials inspected the spring detected in the area and collected samples.

“The expert team said that the major water spring which was detected on the Gap Road stretch posed chances of landslips.”

Vacation rush

The road is temporarily being opened for traffic considering the heavy rush during Christmas and New Year vacation.

The traffic on the Gap Road stretch, the main route connecting Ernakulam and Thekkady from Munnar, was suspended after a major landslip on October 8 claimed two lives.

An interim report by the NIT-C team recommended construction of an alternative road until the road widening works are completed.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.