Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Newcastle Herald
Newcastle Herald
National

Fernleigh track extension and Summerhill waste road: need to get it right early on

WHICH SIDE OF THE FENCE: The idea of the Fernleigh track has been to provide a shared path away from traffic. This artwork raises questions in that regard as far as cycling is concerned. And what about north-bound cycling?

TWO infrastructure stories in today's Newcastle Herald highlight the importance of long-term urban planning, the advantages that accrue from efficient transport links, and the competing priorities that must often be managed in decision-making.

The transport links themselves - a southern addition to the celebrated Fernleigh Track walkway and cycleway, and a 150-metre link road into the Summerhill Waste Management Centre - are not huge projects in themselves.

But each is important in their own way.

The $12-million extension to the Fernleigh route will take it from Belmont to Blacksmiths, with part of the route being a 1.6-kilometre section to run beside the Pacific Highway.

Safety is a huge issue with cycling, and although cyclists regularly share the road with motor vehicles, best practice must surely be to have dedicated cycleways where possible.

Real world projects often differ substantially from early artist's impressions, but it is worth noting that the "shared track" at Belmont has been envisaged with a barrier protecting pedestrians from the highway, but with a cycleway on the road side of the fence.

Surely, if millions of dollars in public money are to be put towards such a venture, better protection could be offered to the cyclists from traffic?

The Summerhill road also raises a "conflict of use" question, pitting the advantages to be gained from a new, second entrance into the facility against the desires - and legal rights - of a major landowner, the Winten Group, which owns a major arc of land south and west of Summerhill, through which the proposed link road would run.

Summerhill is a massive operation, and as reporter Max McKinney observes, has a century of landfill capacity in front of it.

Given its importance also as a recycling centre - and as a power generator, with its substantial solar array - planning issues relating to the steady encroachment of housing along the corridor between Maryland and Minmi need to be settled sooner rather than later.

The Fletcher developments north and east of Summerhill have grown enormously since the landfill was established, and the Winton land - on paper at least - has the potential to bring housing even closer than it is at the moment.

As with the Belmont cycleway, it's a question of separation.

ISSUE: 39,501

SUMMERHILL SOLAR: A new road into the waste management facility should help it achieve more for the region.
Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.