Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Special Correspondent

Coronavirus | Tantransco prepares for blackout on April 5

Power transmission and distribution lines in Chennai. Photo: File (Source: B. Velankanni Raj)

Anticipating a steep fall and subsequent rise in the lighting load on April 5 between 9 p.m and 9.09 p.m., when Prime Minister Narendra Modi has appealed to citizens to switch off lights, the Tamil Nadu Transmission Corporation (Tantransco) is gearing up to ensure proper voltage levels.

Also read | Modi’s Blackout call puts power grid managers on high alert

The Prime Minister requested people to light lamps or candles at 9 p.m. on April 5 to show their solidarity in the fight against COVID-19. Following this, the Tantranso - operations/North/Chennai has issued a set of instructions pertaining to management of sub-stations and lines to its executive engineers.

All its engineers have been asked to be present in Tamil Nadu Generation and Distribution Corporation (Tangedco) headquarters between 8 p.m. and 10.30 p.m. with sufficient manpower. The staff have been instructed to monitor and take necessary action to maintain the correct voltage levels.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.